provision of Three (3) Liquified Petroleum Gas (LPG) Generators as Alternative Backup Power Supply to High Mast Floodlights at interchange Locations in Oyo State and Two (2) Liquified Petroleum Gas (LPG) Generators to Replace Diesel Generators at Odogbo Barracks

Ongoing Infrastructure
placeholder

Project Information

Location
provision of Three (3) Liquified Petroleum Gas (LPG) Generators as Alternative Backup Power Supply to High Mast Floodlights at interchange Locations in Oyo State and Two (2) Liquified Petroleum Gas (LPG) Generators to Replace Diesel Generators at Odogbo Barracks
Distance
— km
Progress
0%
Contractor
N/A
Start
Dec 23, 2025
Est. Completion
Mar 23, 2026
Budget
₦347,462,750

Project Progress

Overall completion: 0%
Milestones
  • ● Procurement completed
  • ● Construction mobilized
  • ● Phase 1 deliverables met
0%
Complete

Award Letters & Documents

Official uploads and certificates
three liquified petroleum gas (LPG) generators as alternative backup power supply to high mast floodlights at intercahnge locations in oyo state and two liquified petroleum gas (LPG) generators to repalce diesel generators at odogbo Barracks

Contractor: ministry of Energy and Mineral Resources

Uploaded: Jan 06, 2026

Open PDF

Location Map

Quick info

Progress: 0%

Start: Dec 23, 2025

Est. End: Mar 23, 2026

Contractor: N/A